Pageviews

10 Days to go....

Well, we have the boat back from the 400 hr service, we have all the bilge pumps working correctly, we have installed a fuel hose for fueling the generator and the 2hp Honda motor. We have decided on using Toad and Dauna's dinghy for the trip. It is 9ft, very stable and the 2hp Honda really pushes it along. Burt is installing some anchoring rings on the forward rails. So, by Wednesday, we should be ready to put the boat into the water, and fill it up with stuff. Then we wait for Monday and Git-R-Done. Check back often and see how we are doing.

No comments:

Post a Comment